INSTALLATION GUIDE :
INSTALLATION GUIDE

MESH-IO
Model No : SMI-01
The Spintly Mesh-IO provides a scalable approach to increase the range of your BLE mesh-enabled IoT network. It is capable of interfacing with Fire Alarm panels, remote sensors monitoring via additional I/O support, providing a BLE Mesh communication extension to legacy hardware.
The Spintly Mesh-IO provides a scalable approach to increase the range of your BLE mesh-enabled IoT network. It is capable of interfacing with Fire Alarm panels, remote sensors monitoring via additional I/O support, providing a BLE Mesh communication extension to legacy hardware.

1. Product Features and Specifications
1.1. Features
- BLE Mesh connectivity to Gateway
- BLE Mesh Networking
- Wide Input operating voltage
- BLE Mesh range extension
- Integration with 3rd party devices
1.2. Electrical Specifications
- Voltage ratings : 5V/12V DC
- Power consumption : 0.75mW max at 5V
4. Mesh IO Pinout:
3.1. Configuration 1 : Standalone Spintly Controller
To ensure proper setup, follow the connection diagram (Fig 3.1.1 below) and screw in the wires into A, B, C (using screw driver provided in box)
Note : Observe the orientation of A, B and C while screwing in the wires. The screw terminal should be facing the user.

3.2. Configuration 2 : Spintly Reader + Controller

- Reader side – Make sure the interface switch is toggled to “O” (OSDP) position as instructed previously. Refer Reader manual – section 3 – step 2.
- These 4 wires should be connected from Reader to Controller
- Power wires — V+ and GND
- Communication wires — Connect RS485 A and RS485 B (refer the Reader manual for color code) to the A and B terminal of the controller respectively. Refer controller manual for more details.
- The locking mechanism (Strike lock or Magnetic lock) should be connected to the Controller
- The sensor inputs (REX and Door sensor) should be connected to controller
Step 3. Plug in the connectors A, B and C as shown in the below image

Step 4. Mounting of device on wall
Pre-drill the mounting locations using “Drill Template” provided in the box. Mount the unit on the wall with the help of wall plugs and screws (2 qty) as shown above.
